Why not make a trail?
Service Project

 

Service Project Description

Re-built a destroyed trail to an abandoned picnic area and re-built the picnic area as well. Cut back bushes, Widened trail with mcleods and polawskis, got my phd (post hole digger) degree and installed posts then made a safety rail on both sides of the trail. Built two picnic tables at the picnic area. Installed two barbeque pits. and finally applied a plaque to the begining of the trail on the safety railing. Trail measured approximately 1/2 mile but very steep.

ContributorStephen Hoefler

Score

Date Entered17-Dec-2006