Church Beautification


Church Beautification


At the Spotswood Reformed church scouts built and installed three benches, put in a boulder retaning wall (three tons of boulders worth) a PVC sign post(for a pre existing sign) a new HDU sign foam sign (5'x3 1/2') flower, two dwarf alberta spruces, mulch, trimed hedges, and fixed four existing trees- newly instaleed and the way the mulch was needed to be fixed and they all had original paking material on. There was 282 hours and 45 minutes put in by other scouts and I put in 121 hours.


The Unknown Scout


Score of 3.0 from 1 reviews.

How would you rate this item?

Click here to report possible copyright violations.

Comments (0)